Taseko Mines Ltd.
Innovative In-Situ Biological Water Treatment
Elevated nitrate and nitrite concentrations in the water stored in the Gibraltar Mine Tailings Storage Facility (TSF) prompted Taseko Mines Ltd. to seek out innovative water treatment technologies. Using our extensive in-situ biological treatment experience, Ensero developed and implemented an in-situ treatment approach, drawing from our various areas of expertise, including geochemistry, hydrodynamic modelling, engineering, treatability testing, microbiology, regulatory permitting, and water treatment.
Within 60 days of in-situ biological treatment, TSF supernatant water met discharge requirements. This approach resulted in a 60% reduction in costs over comparable ex-situ water treatment costs, with zero investment in permanent infrastructure and treatment of significantly larger volumes of water on an expedited timescale. This in-situ biological treatment approach was the first for a TSF in British Columbia.
Client
Taseko Mines Ltd.
Service
Water Management, Permitting
Location
British Columbia, Canada
Keywords
Innovative Water Treatment Approach, In-Situ TSF Water Treatment, Nitrate and Nitrite Water Treatment
.jpg)

.jpg)